Five observations do not necessarily belong at five equally spaced ticks on profile paper. The horizontal axis represents distance along an alignment. A 30 m interval must occupy twice the paper width of a 15 m interval. This exercise uses a short access route with unevenly spaced observations so a plotting mistake shows up in the calculated grades.

Field data and questions

Chainage from start (m) Existing ground level (m)
0 166.20
15 166.95
40 166.45
70 167.65
90 167.45

Assume straight-line change in existing level between adjacent observed stations. A proposed formation starts at 166.50 m and rises at a uniform 1.5 percent along the route. Plot the existing ground, label the signed grade of each segment and find the proposed-versus-existing difference at chainage 55 m. Positive design minus ground means fill in this exercise.

Draw the axes to scale

Try 1 cm to 10 m horizontally and 1 cm to 0.5 m vertically. Place the first station on the left axis and make 166.00 m the base line. The ground observation at chainage 15 appears 1.5 cm right and 1.9 cm above the base. Chainage 40 sits 4.0 cm right of the origin and 0.9 cm above the base. Draw the rest of the stations by the same procedure.

The vertical exaggeration is 10/0.5 = 20. Slopes will look considerably steeper in the drawing than on the ground. Compute percent grades from the numbers in the table. Measuring an angle directly off the exaggerated plot would use two different scale factors and give a misleading result.

Solve the segment grades

The first interval rises 0.75 m in 15 m, so its grade is +5.0 percent. From 15 to 40 the profile falls 0.50 m in 25 m, giving −2.0 percent. From 40 to 70 it rises 1.20 m in 30 m, or +4.0 percent. The last interval falls 0.20 m in 20 m, or −1.0 percent. Each denominator is the difference between the neighboring chainages.

Check the full profile without averaging the four percentages. Sum the rises and falls: +0.75 − 0.50 + 1.20 − 0.20 = +1.25 m. Adding that to the first level gives 167.45 m at the end. Equal averaging of segment grades would ignore the different lengths. The whole-route average grade is approximately +1.39 percent, using 1.25/90 × 100.

Calculate the missing station

Chainage 55 lies halfway between 40 and 70. Interpolate the existing level as 166.45 + 15 × 0.04 = 167.05 m. The formation at 55 is 166.50 + 55 × 0.015 = 167.325 m. Design minus ground equals +0.275 m, so the section at that station needs fill at the profile line. It is a depth at one point on the alignment. A volume calculation would also require the cross-sectional shape and its variation along the route.

Grade the explanation

A complete answer labels the chainage and elevation axes with bounds and units, plots the observed stations at the right positions, and draws the ground interpolation separately from the proposed grade. Give partial credit when a student correctly finds 167.05 but reports cut instead of fill; ask them to point to which line is higher at 55 m.

For an extension, insert a surveyed ditch bottom at chainage 55 with level 166.80. The interpolation assumption for the 40–70 interval is now superseded by an observation. The revised depth is 167.325 − 166.80 = 0.525 m of fill. The design stayed fixed while additional field information changed the existing profile. That distinction is central to interpreting any smooth line drawn between sparse observations.

References